107TH AVE over DRAINAGE TO MAXWELL LAKE

GATE 6 · County 245, Georgia · Built 2020 · 4 Lanes · 62,550 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPTRAGORBRG107
Year Built
2020
Length
13 m (42.7 ft)
Max Span
13 m
Width
34.7 m (113.8 ft)
Lanes
4
Daily Traffic
62,550
Material
Concrete
Design
Arch - Deck
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.