TOBACCO ROAD over SR 4 (US 1)
5.6 MI NW OF HEPHZIBAH · County 245, Georgia · Built 2001 · 6 Lanes · 17,500 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.393864, -82.116547
This bridge is in worse condition than 21.9% of bridges in County 245. The average bridge in Georgia is 0 years old; this one is 25 years old.
Nearby Bridges
US 1 FL FRWAY (NBL over NORTH FORK SPIRIT CREEK
Built 1990
US 1 (SBL) SR 4 over NORTH FORK SPIRIT CREEK
Built 2022
SR 4 - US 1 (NBL) over BUTLER CREEK
Built 1962
SR 4 - US 1 (SBL) over BUTLER CREEK
Built 1952
OLD U.S. 1 over BUTLER CREEK
Built 1936
OLD U.S. 1 over BUTLER CREEK OVERFLOW
Built 1937
US 1 SR 4 SBL over SOUTH PRONG CREEK
Built 2021
US 1 FL FRWAY (NBL over SOUTH PRONG CREEK
Built 1990
CHAMBERLAIN AVE over BUTLER CREEK TRIB
Built 1996
SR 383 over CSX RAILROAD
Built 1998
Bridge Details
- Structure #
- 000000024550650
- Year Built
- 2001
- Length
- 67.1 m (220.1 ft)
- Max Span
- 35.1 m
- Width
- 30.8 m (101 ft)
- Lanes
- 6
- Daily Traffic
- 17,500
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,797,000
- Total Project Cost
- $2,696,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.