CHAMBERLAIN AVE over BUTLER CREEK TRIB

NEAR GATE 1 · County 245, Georgia · Built 1996 · 7 Lanes · 12,500 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
DAPTRAGOR000008
Year Built
1996
Length
20.3 m (66.6 ft)
Max Span
3 m
Lanes
7
Daily Traffic
12,500
Material
Concrete
Design
Culvert
Owner
Other
Last Inspected
N/A
Est. Improvement
$317,000
Total Project Cost
$317,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.