US 1 FL FRWAY (NBL over NORTH FORK SPIRIT CREEK

4.7 MI NW OF HEPHZIBAH · County 245, Georgia · Built 1990 · 2 Lanes · 12,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000024501170
Year Built
1990
Length
32.9 m (107.9 ft)
Max Span
12.2 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
12,000
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$422,000
Total Project Cost
$633,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.