KELLY ROAD over HWY 1/27/280

.3 KM E/O OLD CUSSETA HWY · County 053, Georgia · Built 2011 · 2 Lanes · 100 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPTRABEN0M8042
Year Built
2011
Length
61 m (200.1 ft)
Max Span
30.5 m
Width
10.6 m (34.8 ft)
Lanes
2
Daily Traffic
100
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.