TANK TRAIL over VICTORY DRIVE (US 27)

1 KM E/O TWILIGHT RD · County 053, Georgia · Built 1998 · 2 Lanes · 50 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
DAPTRABEN000046
Year Built
1998
Length
74 m (242.8 ft)
Max Span
22 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
50
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.