FIRST DIVISION RD. over SR 520 (US 27) 1.97 EAST
7.5 MI NW OF CUSSETA · County 053, Georgia · Built 1943 · 2 Lanes · 10,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.381881, -84.868392
This bridge is in worse condition than 73.3% of bridges in County 053. The average bridge in Georgia is 0 years old; this one is 83 years old.
Nearby Bridges
TANK TRAIL over VICTORY DRIVE (US 27)
Built 1998
RAMP over HIGHWAY 1/27/280
Built 2010
8TH DIVISION RD over HIGHWAY 1/27/280
Built 2010
SR 520 (US 27) over CS 24874 MARNE ROAD
Built 1943
WOOD ROAD over UNKNOWN STREAM
Built 2012
WOOD ROAD over UNKNOWN STREAM
Built 2012
FIRST DIVISION RD over OCHILLE CREEK
Built 2011
KELLY ROAD over HWY 1/27/280
Built 2011
OLD CUSSETA ROAD over UPATOI CREEK
Built 2019
SR 520 - US 27 (WB over UPATOI CREEK
Built 1943
Bridge Details
- Structure #
- 000000005300190
- Year Built
- 1943
- Length
- 64 m (210 ft)
- Max Span
- 16.8 m
- Width
- 8.5 m (27.9 ft)
- Lanes
- 2
- Daily Traffic
- 10,900
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $821,000
- Total Project Cost
- $1,231,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.