RAMP over HIGHWAY 1/27/280

1 KM N/O 8TH DIVISION RD · County 053, Georgia · Built 2010 · 2 Lanes · 500 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
DAPTRABEN0M2011
Year Built
2010
Length
50.3 m (165 ft)
Max Span
27.1 m
Width
20.7 m (67.9 ft)
Lanes
2
Daily Traffic
500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
Other
Last Inspected
N/A
Est. Improvement
$1,000
Total Project Cost
$2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.