8TH DIVISION RD over HIGHWAY 1/27/280
.2 KM E/O OLD CUSSETA HWY · County 053, Georgia · Built 2010 · 4 Lanes · 100 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
32.371631, -84.857019
This bridge is in worse condition than 40% of bridges in County 053. The average bridge in Georgia is 0 years old; this one is 16 years old.
Nearby Bridges
RAMP over HIGHWAY 1/27/280
Built 2010
KELLY ROAD over HWY 1/27/280
Built 2011
FIRST DIVISION RD. over SR 520 (US 27) 1.97 EAST
Built 1943
TANK TRAIL over VICTORY DRIVE (US 27)
Built 1998
SR 520 (US 27) over CS 33156 VICTORY POND RD
Built 1943
WOOD ROAD over UNKNOWN STREAM
Built 2012
WOOD ROAD over UNKNOWN STREAM
Built 2012
FIRST DIVISION RD over OCHILLE CREEK
Built 2011
HOUR GLASS ROAD over SR 520 (US 27) 5.08 EAST
Built 1943
SR 520 (US 27) over CS 24874 MARNE ROAD
Built 1943
Bridge Details
- Structure #
- DAPTRABEN0M0214
- Year Built
- 2010
- Length
- 50.9 m (167 ft)
- Max Span
- 25.5 m
- Width
- 24.7 m (81 ft)
- Lanes
- 4
- Daily Traffic
- 100
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other
- Last Inspected
- N/A
- Est. Improvement
- $1,000
- Total Project Cost
- $2,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.