US 80 / SR 22 over AUCHMPKEE CREEK

12 MI S OF THOMASTON · County 293, Georgia · Built 1995 · 2 Lanes · 1,330 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029300360
Year Built
1995
Length
64.6 m (211.9 ft)
Max Span
16.2 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
1,330
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.