US 80 / SR 22 over DUCK CREEK

13 MI NW OF BUTLER · County 269, Georgia · Built 1932 · 2 Lanes · 310 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
000000026900100
Year Built
1932
Length
8.8 m (28.9 ft)
Max Span
2.7 m
Lanes
2
Daily Traffic
310
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$113,000
Total Project Cost
$170,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.