HOLLIS ROAD over ULCOHATCHEE CREEK

15 MI W OF ROBERTA · County 079, Georgia · Built 1993 · 2 Lanes · 350 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000007950130
Year Built
1993
Length
54.9 m (180.1 ft)
Max Span
12.2 m
Width
8.1 m (26.6 ft)
Lanes
2
Daily Traffic
350
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$703,000
Total Project Cost
$1,055,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.