SR 22 over BAILEY BRANCH

8 MI W OF ROBERTA · County 079, Georgia · Built 2017 · 2 Lanes · 1,780 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000007950370
Year Built
2017
Length
48.8 m (160.1 ft)
Max Span
18.3 m
Width
13.2 m (43.3 ft)
Lanes
2
Daily Traffic
1,780
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$14,208,000
Total Project Cost
$21,312,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.