US 80 over ULCOHATCHEE CREEK

6 MI W OF ROBERTA · County 079, Georgia · Built 1936 · 2 Lanes · 1,430 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000007900080
Year Built
1936
Reconstructed
1959
Length
72.5 m (237.9 ft)
Max Span
10.4 m
Width
10.4 m (34.1 ft)
Lanes
2
Daily Traffic
1,430
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$930,000
Total Project Cost
$1,395,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.