US 19 SBL / SR 3 over TOBLER CREEK

7 MI S OF THOMASTON · County 293, Georgia · Built 1996 · 2 Lanes · 2,520 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029350520
Year Built
1996
Length
91.4 m (299.9 ft)
Max Span
39.6 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
2,520
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,172,000
Total Project Cost
$1,758,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.