WAYNMANVILLE ROAD over TOBLER CREEK

7 MI E OF THOMASTON · County 293, Georgia · Built 1965 · 2 Lanes · 370 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029300240
Year Built
1965
Length
51.2 m (168 ft)
Max Span
17.1 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
370
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$656,000
Total Project Cost
$985,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.