TRIUNE MILL ROAD over TOBLER CREEK

7 MI SE OF THOMASTON · County 293, Georgia · Built 1960 · 2 Lanes · 519 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000029350190
Year Built
1960
Length
81.1 m (266.1 ft)
Max Span
11.6 m
Width
9.2 m (30.2 ft)
Lanes
2
Daily Traffic
519
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,039,000
Total Project Cost
$1,559,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.