WHITESVILLE ROAD over SR 22(US 80)-2 SR 22 RMP

N COLUMBUS BYPASS · County 215, Georgia · Built 1983 · 3 Lanes · 14,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000021501390
Year Built
1983
Length
115.8 m (379.9 ft)
Max Span
57.9 m
Width
23.3 m (76.4 ft)
Lanes
3
Daily Traffic
14,500
Material
Prestressed Concrete Continuous
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,890,000
Total Project Cost
$2,834,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.