SR 22R EBL- US 80 over I-185(SR411)-2 I-185 RMP

N. COLUMBUS BY-PASS EX · County 215, Georgia · Built 1983 · 3 Lanes · 5,462 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501340
Year Built
1983
Length
127.4 m (418 ft)
Max Span
64 m
Width
15.6 m (51.2 ft)
Lanes
3
Daily Traffic
5,462
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,079,000
Total Project Cost
$3,118,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.