US 80 WBL/ SR 22 over I-185(SR411)-2 I-185 RMP

N. COLUMBUS - EXIT 4 · County 215, Georgia · Built 1988 · 2 Lanes · 3,870 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021501470
Year Built
1988
Length
127.4 m (418 ft)
Max Span
64 m
Width
16.2 m (53.1 ft)
Lanes
2
Daily Traffic
3,870
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,633,000
Total Project Cost
$2,450,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.