I-185 SBL over NS RAILROAD

0.5 MI N SR 1-NW COLUMB · County 215, Georgia · Built 1977 · 4 Lanes · 22,300 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000021500750
Year Built
1977
Reconstructed
1983
Length
95.4 m (313 ft)
Max Span
36.9 m
Width
26.6 m (87.3 ft)
Lanes
4
Daily Traffic
22,300
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,890,000
Total Project Cost
$2,835,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.