US 41 - SR 7 over I-75 (EXIT 22)
5 MI N OF VALDOSTA · County 185, Georgia · Built 2019 · 4 Lanes · 3,380 vehicles/day
Overall
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 8 | Very Good |
| Substructure | 7 | Good |
Location
30.894681, -83.355714
This bridge is in worse condition than 36.9% of bridges in County 185. The average bridge in Georgia is 0 years old; this one is 7 years old.
Nearby Bridges
SHILOH ROAD over FRANKS CREEK
Built 1985
US 41 (NBL)- SR 7 over CSX RAILROAD
Built 1961
US 41 - SR 7 (SBL) over CSX RAILROAD
Built 1961
US 41 (SBL)- SR 7 over WITHLACOOCHEE RIVER O/F
Built 1962
US 41 (NBL) over WITHLACOOCHEE RIVER
Built 1962
US 41 (NBL)- SR 7 over WITHLACOOCHEE RIVER O/F
Built 1962
SR 7 @ 33.06N over TYLER CREEK
Built 1961
US 41 (SBL) over WITHLACOOCHEE RIVER
Built 1962
SR 133 over LITTLE RIVER
Built 2000
I-75 over WITHLACOOCHEE RIVER
Built 1961
Bridge Details
- Structure #
- 000000018550930
- Year Built
- 2019
- Length
- 78.3 m (256.9 ft)
- Max Span
- 41.8 m
- Width
- 27.8 m (91.2 ft)
- Lanes
- 4
- Daily Traffic
- 3,380
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $22,792,000
- Total Project Cost
- $34,188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.