US 41 - SR 7 over I-75 (EXIT 22)

5 MI N OF VALDOSTA · County 185, Georgia · Built 2019 · 4 Lanes · 3,380 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018550930
Year Built
2019
Length
78.3 m (256.9 ft)
Max Span
41.8 m
Width
27.8 m (91.2 ft)
Lanes
4
Daily Traffic
3,380
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$22,792,000
Total Project Cost
$34,188,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.