US 41 (SBL) over WITHLACOOCHEE RIVER
APP 2 MI N OF VALDOSTA · County 185, Georgia · Built 1962 · 2 Lanes · 26,180 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.885372, -83.312339
This bridge is in worse condition than 36.9% of bridges in County 185. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
US 41 (SBL)- SR 7 over WITHLACOOCHEE RIVER O/F
Built 1962
US 41 (NBL)- SR 7 over WITHLACOOCHEE RIVER O/F
Built 1962
US 41 (NBL) over WITHLACOOCHEE RIVER
Built 1962
CS 2500 JERRY JO over TWO MILE CREEK
Built 1981
CS 962 BERKLEY AV over TWO MILE CREEK
Built 1999
CS 519 GRONTO ROA over SUGAR CREEK
Built 1981
US 41 - SR 7 (SBL) over CSX RAILROAD
Built 1961
CS 1014 NORTH OAK over TWO MILE BRANCH
Built 1998
US 41 (NBL)- SR 7 over CSX RAILROAD
Built 1961
STATEN ROAD over CHERRY CREEK
Built 1961
Bridge Details
- Structure #
- 000000018500060
- Year Built
- 1962
- Length
- 113.4 m (372 ft)
- Max Span
- 12.2 m
- Width
- 10.5 m (34.4 ft)
- Lanes
- 2
- Daily Traffic
- 26,180
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,453,000
- Total Project Cost
- $2,180,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.