US 41 (NBL)- SR 7 over WITHLACOOCHEE RIVER O/F
N OF VALDOSTA · County 185, Georgia · Built 1962 · 2 Lanes · 29,700 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
30.892686, -83.318639
This bridge is in worse condition than 36.9% of bridges in County 185. The average bridge in Georgia is 0 years old; this one is 64 years old.
Nearby Bridges
US 41 (NBL) over WITHLACOOCHEE RIVER
Built 1962
US 41 (SBL)- SR 7 over WITHLACOOCHEE RIVER O/F
Built 1962
US 41 (SBL) over WITHLACOOCHEE RIVER
Built 1962
US 41 - SR 7 (SBL) over CSX RAILROAD
Built 1961
US 41 (NBL)- SR 7 over CSX RAILROAD
Built 1961
CS 2500 JERRY JO over TWO MILE CREEK
Built 1981
STATEN ROAD over CHERRY CREEK
Built 1961
US 41 - SR 7 over I-75 (EXIT 22)
Built 2019
CS 962 BERKLEY AV over TWO MILE CREEK
Built 1999
CS 519 GRONTO ROA over SUGAR CREEK
Built 1981
Bridge Details
- Structure #
- 000000018500030
- Year Built
- 1962
- Length
- 97.5 m (319.9 ft)
- Max Span
- 9.8 m
- Width
- 10.6 m (34.8 ft)
- Lanes
- 2
- Daily Traffic
- 29,700
- Material
- Concrete
- Design
- Tee Beam
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,250,000
- Total Project Cost
- $1,875,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.