I-75 over WITHLACOOCHEE RIVER

APP .5 MI N OF VALDOSTA · County 185, Georgia · Built 1961 · 6 Lanes · 61,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000018500490
Year Built
1961
Reconstructed
2004
Length
154.8 m (507.9 ft)
Max Span
15.2 m
Width
40.2 m (131.9 ft)
Lanes
6
Daily Traffic
61,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,150,000
Total Project Cost
$6,225,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.