SR 133 over I-75 (EXIT 18)

APP 2 MI NW OF VALDOSTA · County 185, Georgia · Built 1961 · 5 Lanes · 11,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000018500200
Year Built
1961
Reconstructed
1990
Length
107.9 m (354 ft)
Max Span
37.8 m
Width
24.5 m (80.4 ft)
Lanes
5
Daily Traffic
11,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,515,000
Total Project Cost
$3,772,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.