I-95 NBL over SOUTH BRUNSWICK RIVER

1.2 MI N I-95 & SR520 INT · County 127, Georgia · Built 1977 · 3 Lanes · 63,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012700470
Year Built
1977
Reconstructed
2008
Length
564.5 m (1852 ft)
Max Span
28 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
63,900
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$9,210,000
Total Project Cost
$13,814,000