I-95 NBL over SR 520 (US 17)

0.7 MI E OF INT SR 25-303 · County 127, Georgia · Built 1976 · 3 Lanes · 63,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012700430
Year Built
1976
Reconstructed
2006
Length
77.7 m (254.9 ft)
Max Span
26.8 m
Width
24.3 m (79.7 ft)
Lanes
3
Daily Traffic
63,900
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,268,000
Total Project Cost
$1,902,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.