I-95 SBL over SR 303 - HILLERY SLOUGH

INT OF I-95 AND SR 303 · County 127, Georgia · Built 1977 · 3 Lanes · 60,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012700500
Year Built
1977
Reconstructed
2008
Length
409.7 m (1344.2 ft)
Max Span
47.9 m
Width
24 m (78.7 ft)
Lanes
3
Daily Traffic
60,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,683,000
Total Project Cost
$10,025,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.