I-95 NBL over SR 303 - HILLERY SLOUGH

INT I-95 & SR 303 · County 127, Georgia · Built 1977 · 3 Lanes · 63,900 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012700490
Year Built
1977
Reconstructed
2008
Length
365.5 m (1199.1 ft)
Max Span
47.5 m
Width
24.1 m (79.1 ft)
Lanes
3
Daily Traffic
63,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,962,000
Total Project Cost
$8,944,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.