US 19 over M-9250 ABERNATHY ROAD

6.2 MILES S OF ROSWELL · County 121, Georgia · Built 2022 · 1 Lanes · 53,150 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012154270
Year Built
2022
Length
108.2 m (355 ft)
Max Span
31.7 m
Width
11.9 m (39 ft)
Lanes
1
Daily Traffic
53,150
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$31,524,000
Total Project Cost
$47,286,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.