US 19 over M-9250 ABERNATHY ROAD

5.9 MI S OF ROSWELL · County 121, Georgia · Built 2022 · 6 Lanes · 165,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000012154280
Year Built
2022
Length
52.7 m (172.9 ft)
Max Span
28 m
Width
36.3 m (119.1 ft)
Lanes
6
Daily Traffic
165,000
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,392,000
Total Project Cost
$23,088,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.