HAMMOND DRIVE over SR 400 (US 19)

0.7 MILES NORTH OF I-285 · County 121, Georgia · Built 2011 · 9 Lanes · 22,100 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153480
Year Built
2011
Length
112.8 m (370.1 ft)
Max Span
46.6 m
Width
41.5 m (136.2 ft)
Lanes
9
Daily Traffic
22,100
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,206,000
Total Project Cost
$6,308,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.