COBB PARKWAY/US 41 over CHATTAHOOCHEE RIVER

IN N FULTON · County 121, Georgia · Built 2013 · 4 Lanes · 25,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012153620
Year Built
2013
Length
161.5 m (529.9 ft)
Max Span
42.7 m
Width
33.8 m (110.9 ft)
Lanes
4
Daily Traffic
25,600
Material
Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$47,064,000
Total Project Cost
$70,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.