I-75 RAMP over I-75R TO I-285

7.1 MI SE OF MARRIETTA · County 067, Georgia · Built 1998 · 2 Lanes · 2,580 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
000000006751930
Year Built
1998
Length
20.7 m (67.9 ft)
Max Span
20.7 m
Width
17.7 m (58.1 ft)
Lanes
2
Daily Traffic
2,580
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$266,000
Total Project Cost
$399,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.