I-75/I-285/RAMP-B over ROTTENWOOD CR/CUMB PKY

6.7 MILES SOUTH EAST OF M · County 067, Georgia · Built 2017 · 2 Lanes · 6,805 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753320
Year Built
2017
Length
311.2 m (1021 ft)
Max Span
41.8 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
6,805
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$90,665,000
Total Project Cost
$135,997,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.