I-75/I-285/RAMP-C over R-WOOD CR/75/285/CUMB

6.8 MILES SOUTH EAST OF M · County 067, Georgia · Built 2017 · 2 Lanes · 6,420 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006753330
Year Built
2017
Length
861.7 m (2827.1 ft)
Max Span
71.6 m
Width
8.8 m (28.9 ft)
Lanes
2
Daily Traffic
6,420
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$251,037,000
Total Project Cost
$376,555,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.