I-285 over RAMP I-285C TO I-75 NBL

6.7 MILES SOUTH EAST OF M · County 067, Georgia · Built 1978 · 5 Lanes · 72,600 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
000000006701030
Year Built
1978
Length
100.6 m (330.1 ft)
Max Span
63.1 m
Width
34.7 m (113.8 ft)
Lanes
5
Daily Traffic
72,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,344,000
Total Project Cost
$3,516,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.