I-75 over I-285 RAMP CBL CD
6.7 MI SE OF MARIETTA · County 067, Georgia · Built 1963 · 8 Lanes · 149,000 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
33.889689, -84.460225
This bridge is in worse condition than 26.8% of bridges in County 067. The average bridge in Georgia is 0 years old; this one is 63 years old.
Nearby Bridges
I-75/I-285/RAMP-C over R-WOOD CR/75/285/CUMB
Built 2017
I-285 over RAMP I-285C TO I-75 NBL
Built 1978
RAMP I-285W TO I-7 over I-285 CBL CD
Built 1963
I-285 RMP CCBL- CD over I-285 RAMP TO I-75 NBL
Built 1963
I-285 over I-75
Built 1978
I-75 RAMP TO I-285 over I-285- I-75- 3 RAMPS
Built 1986
I-285 RMP CCBL- CD over I-75
Built 2017
I-285 over RMP I-285 CCBL TO I-75S
Built 1978
I-75 R TO I-285 WB over I-285 CD WEST BOUND
Built 1986
I-75/I-285/RAMP-B over ROTTENWOOD CR/CUMB PKY
Built 2017
Bridge Details
- Structure #
- 000000006700660
- Year Built
- 1963
- Reconstructed
- 2018
- Length
- 51.8 m (169.9 ft)
- Max Span
- 23.8 m
- Width
- 54.6 m (179.1 ft)
- Lanes
- 8
- Daily Traffic
- 149,000
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,751,000
- Total Project Cost
- $2,627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.