I-75 over I-285 RAMP CBL CD

6.7 MI SE OF MARIETTA · County 067, Georgia · Built 1963 · 8 Lanes · 149,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000006700660
Year Built
1963
Reconstructed
2018
Length
51.8 m (169.9 ft)
Max Span
23.8 m
Width
54.6 m (179.1 ft)
Lanes
8
Daily Traffic
149,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,751,000
Total Project Cost
$2,627,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.