I-285 RAMP CBL CD over ROTTENWOOD CR & CUMB PKY

6.7 MILES SOUTH EAST OF M · County 067, Georgia · Built 1999 · 3 Lanes · 30,400 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006752480
Year Built
1999
Length
88.7 m (291 ft)
Max Span
32 m
Width
21.7 m (71.2 ft)
Lanes
3
Daily Traffic
30,400
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,447,000
Total Project Cost
$2,171,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.