CUMBERLAND BLVD. over I-75

7.1 MI SE OF MARIETTA · County 067, Georgia · Built 1997 · 8 Lanes · 18,106 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000006751950
Year Built
1997
Length
97.8 m (320.9 ft)
Max Span
52.1 m
Width
36 m (118.1 ft)
Lanes
8
Daily Traffic
18,106
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,307,000
Total Project Cost
$4,960,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.