I-75 over SR 3 NORTHSIDE PARKWAY

IN N ATLANTA · County 121, Georgia · Built 1964 · 10 Lanes · 190,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012101550
Year Built
1964
Reconstructed
1983
Length
91.4 m (299.9 ft)
Max Span
46.6 m
Width
53.4 m (175.2 ft)
Lanes
10
Daily Traffic
190,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,730,000
Total Project Cost
$5,594,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.