NSIDE PARKWAY US over NANCY CREEK

IN N ATLANTA · County 121, Georgia · Built 1938 · 4 Lanes · 23,500 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012100140
Year Built
1938
Reconstructed
1954
Length
26.2 m (86 ft)
Max Span
9.1 m
Width
22.2 m (72.8 ft)
Lanes
4
Daily Traffic
23,500
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$519,000
Total Project Cost
$779,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.