I-75 over M-9241 MT. PARAN ROAD

IN N ATLANTA · County 121, Georgia · Built 1964 · 10 Lanes · 181,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012101570
Year Built
1964
Reconstructed
1983
Length
43 m (141.1 ft)
Max Span
18.6 m
Width
53.4 m (175.2 ft)
Lanes
10
Daily Traffic
181,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,753,000
Total Project Cost
$2,629,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.