I-20 over SR 3- NOR SOUTHERN RR

IN ATLANTA · County 121, Georgia · Built 1963 · 12 Lanes · 207,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
8
Very Good
Substructure
5
Fair

Bridge Details

Structure #
000000012101800
Year Built
1963
Reconstructed
1986
Length
272.2 m (893 ft)
Max Span
30.5 m
Width
57.6 m (189 ft)
Lanes
12
Daily Traffic
207,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,005,000
Total Project Cost
$19,507,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.