SR 154 SPUR over I-20

IN E ATLANTA · County 121, Georgia · Built 1992 · 2 Lanes · 12,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012107570
Year Built
1992
Length
68 m (223.1 ft)
Max Span
36 m
Width
16.6 m (54.5 ft)
Lanes
2
Daily Traffic
12,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$871,000
Total Project Cost
$1,307,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.