PETERS STREET over SR 3(US 19) NORTHSIDE DR
IN W ATLANTA · County 121, Georgia · Built 1953 · 6 Lanes · 5,540 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 7 | Good |
Location
33.7432, -84.408292
This bridge is in worse condition than 67.7% of bridges in County 121. The average bridge in Georgia is 0 years old; this one is 73 years old.
Nearby Bridges
WHITEHALL STREET over NS RAILROAD (718069H)
Built 1990
I-20 over SR 3- NOR SOUTHERN RR
Built 1963
I-20 over SR 14- M-9124- NS RR.
Built 1962
SR 154 SPUR over I-20
Built 1992
MCDANIEL STREET over NS RAILROAD (718067U)
Built 1988
MCDANIEL STREET over I-20
Built 1988
LEE STREET over I-20
Built 1962
I-20 over JOSEPH E. LOWERY BLVD.
Built 1962
I-20- AND 2 RAMPS over M-9160 WINDSOR STREET
Built 1962
WHITEHALL STREET over M-9073 SPRING STREET
Built 1963
Bridge Details
- Structure #
- 000000012100480
- Year Built
- 1953
- Length
- 26.2 m (86 ft)
- Max Span
- 13.1 m
- Width
- 20.6 m (67.6 ft)
- Lanes
- 6
- Daily Traffic
- 5,540
- Material
- Concrete Continuous
- Design
- Slab
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $703,000
- Total Project Cost
- $1,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.