US 29 / SR. 14 over SR 166

IN NORTH EAST POINT · County 121, Georgia · Built 1983 · 5 Lanes · 17,600 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
000000012100460
Year Built
1983
Length
83.5 m (274 ft)
Max Span
34.7 m
Width
23.8 m (78.1 ft)
Lanes
5
Daily Traffic
17,600
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,946,000
Total Project Cost
$2,920,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.