LANKFORD PARKWAY over M-9081 SYLVAN ROAD

IN EAST POINT · County 121, Georgia · Built 1963 · 4 Lanes · 64,200 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012101010
Year Built
1963
Reconstructed
1987
Length
53 m (173.9 ft)
Max Span
13.4 m
Width
31.4 m (103 ft)
Lanes
4
Daily Traffic
64,200
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.