I-85 SBL over RAMP FR. RD. TO I-75 SBL

IN S ATLANTA · County 121, Georgia · Built 1986 · 4 Lanes · 205,000 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
000000012102050
Year Built
1986
Length
38.4 m (126 ft)
Max Span
38.4 m
Width
23.7 m (77.8 ft)
Lanes
4
Daily Traffic
205,000
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$0
Total Project Cost
$0
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.